Elite Screens CineTension2 TE100HW2-E24 254 cm (100") Electric Projection Screen

  • Part: 3919887
  • Model: TE100HW2-E24
$2,139.09 Ex Tax
  • 34% OFF

Availability

Out of Stock

Bulk Pricing

Quantity Price
5 - 9 $2,102.23 Ex Tax
10+ $2,060.36 Ex Tax

Elite Screens® CineTension2 series is an electric motorized, premium grade projection screen. The built-in tab-tension system is designed to prevent wrinkles or curling, and ensures a tensioned viewing area. The aluminum housing with enamel coating is moisture resistant and the aesthetically pleasing design compliments any environment with luxury and class. The tubular motor operates swiftly and smoothly, and can be operated using one of the following included accessories: infrared (IR) remote, radio frequency (RF) remote, 3-way wall switch, or built in 12 volt trigger that synchronizes the drop and rise function with the projector's power cycle. Choose from a variety of screen materials that meets your needs including CineWhite®, CineGrey, Wraith Veil, or PowerGain. Since 2004, Elite Screens® has become a global leader in projection screen manufacturing through its headquarters in the US and branch offices in Europe, Japan, Australia, India, Taiwan, and China. With a focus on superior product and service, Elite Screens® is dedicated to making projection screens for any projection environment. Ask about Elite's 2-year warranty and 3-year ENR-G enhanced warranty.

  • General Information
    • Manufacturer
    • Elite Screens, Inc
    • Manufacturer Part Number
    • TE100HW2-E24
    • Manufacturer Website Address
    • http://www.elitescreens.com
    • Brand Name
    • Elite Screens
    • Product Line
    • CineTension2
    • Product Model
    • TE100HW2-E24
    • Product Name
    • CineTension2 TE100HW2-E24 Projection Screen
    • Product Type
    • Projection Screen
  • Technical Information
    • Diagonal Image Size
    • 254 cm (100")
    • Screen Height
    • 124.5 cm (49")
    • Screen Width
    • 221.5 cm (87.2")
    • Screen Fabric
    • CineWhite
    • Front Projection
    • Yes
    • Aspect Ratio
    • 16:9
    • Screen Gain
    • 1.1
    • Viewing Angle
    • 180°
    • Screen Folding Mechanism
    • Electric
  • Physical Characteristics
    • Mount Type
    • Wall/Ceiling Mount
    • Height
    • 2120.9 mm
    • Width
    • 2616.2 mm
    • Depth
    • 132.1 mm
    • Weight (Approximate)
    • 20.82 kg
  • Miscellaneous
    • Additional Information
      • Tensioned : Yes
      • Drop : 24"
      • Housing/Bracket Height : 6.7"
      • Case Color : Black
    • Assembly Required
    • No